In this blog
- Where stormwater problems start
- Which stormwater requirements apply
- Who may be responsible for runoff or contamination
- How to prepare before heavy rain
- What to do after a release or agency notice
- Talk with a California environmental attorney
A storm can turn a clogged drain, uncovered drum, or exposed stockpile into a problem that reaches the property next door. El Niño increases the odds of a wetter winter in Southern California, although rainfall can vary widely across the state. Before the next storm, walk your site and identify where runoff enters, what it passes over, and where it leaves.
Where Do Stormwater Problems Start?
Water flowing across a loading dock can pick up oil and carry it into a street drain. On a construction site, runoff can move sediment beyond the work area. At a former gas station or industrial property, erosion can carry contaminated soil into a drainage ditch or onto an adjoining parcel. Knowing the site’s history and the path runoff takes can help you identify what to investigate after a storm.
Which Stormwater Requirements Apply?
California’s Industrial General Permit regulates stormwater discharges from specified industrial activities. In October 2026, the California Water Boards reminded covered facilities that permit requirements remain in effect during El Niño. Check whether your Stormwater Pollution Prevention Plan reflects current operations and confirm who handles required observations, sampling, and reporting.
California’s statewide construction permit generally applies to projects that disturb at least one acre of soil. Work on a smaller parcel can require coverage if it is part of a larger common plan of development or sale that disturbs at least one acre in total. Check local requirements as well. San Diego, for example, regulates discharges into its storm drain system.
Who May Be Responsible For Runoff Or Contamination?
Consider a warehouse where the owner maintains a shared drain, the tenant stores drums outdoors, and a contractor has changed the slope of a loading area. If contaminated runoff leaves the property, each party may hold records that help explain what happened. Review who controlled the source and drainage route, what the contracts say about maintenance and cleanup costs, and what duties apply under environmental law.
How To Prepare Before Heavy Rain?
Use a site map to check drains, low spots, property boundaries, and areas where materials are stored outdoors. Clear blocked inlets, secure containers, and repair damaged erosion controls. Record what you inspected and when repairs were completed. For a permitted site, confirm who will monitor the forecast, perform required storm inspections or sampling, and cover those duties if the primary contact is unavailable.
What To Do After A Release Or Agency Notice?
Once conditions are safe, document the time, location, and apparent path of the runoff. Preserve photographs, inspection logs, and records of corrective work. Before pumping water from an excavation or containment area, confirm where it can lawfully be discharged.
California requires the responsible person to report a significant hazardous-material release or threatened release immediately to the Cal OES State Warning Center at 800-852-7550 and either the local Unified Program Agency or 911. Check whether your permit or other applicable rules require additional notifications.
If you receive a notice or order, identify the response deadline and what the agency is asking you to provide. A Regional Water Board can require technical or monitoring reports under California Water Code section 13267. When the statutory conditions are met, it can also issue a cleanup and abatement order under section 13304.
Talk With A California Environmental Attorney
Tropea McMillan, LLP helps California businesses and property owners evaluate stormwater obligations, respond to agency inquiries, and defend against Clean Water Act enforcement. If runoff has left your property or you have received an agency notice, contact the firm to discuss the facts and any response deadlines. Contact Tropea McMillan
